The Fountain Design Company Introduces the Process of Fountain Pool for You
Publish Time:2019/04/16 NEWS Number of views:1055
- Base cleaning: before construction, the base that have passed the acceptance check shall be cleaned up.
- Brushing base treatment agent: brushing a chloroprene rubber asphalt adhesive diluted with gasoline on the base surface, and the brush should be even and impenetrable.
- Laying additional layer: laying a layer of coil at the root of the tube and the corner of yin and yang. According to the specifications and design requirements, the coil is cut into corresponding shapes for laying.
- Laying coils: modified asphalt waterproofing coils are cut and rolled up according to the length of the laying, and the rolled coils are put into the coils with 30-diameter tubes. The ends of the coils are equal to the starting point of the laying, and the gasoline spray lamps or special flame spraying guns are ignited. The junction of the base and the coils is heated, and the distance between the spraying guns and the heating surface is about 300 mm.When the asphalt of the material has just melted, the two ends of the handrail pipe center should be laid forward slowly, and the force should be uniform and not diffuse. The blank holder width should be well controlled. The overlap width of full-bonding method is 80 mm and the overlap width of strip-bonding method is 100 mm.