Fountain company on-site installation and commissioning of fountain:
On site installation personnel must wear safety protection equipment. Assemble on site according to the design drawing and the number of assembly in site. After the assembly is completed, the inspection and repair shall be carried out strictly once again.
When the electrical equipment is tested at the delivery point, a special person shall be responsible for communication monitoring and recording various data. In case of any non-compliance with the design requirements, it shall be repaired or replaced in time. It is strictly prohibited to carry out the commissioning operation of electrical components in the presence of no supervisor.
After assembly, the sundries on site and in the pool shall be completely removed, and then water shall be injected into the pool. Adjust the water level to the design water depth with the overflow pipe of the pool, and then carry out pressure test and spray test. Check whether the control procedures, waterscape modeling, colorful lights, safety measures, etc. meet the design requirements, and deliver them to the operation after acceptance.
- Choosing a fountain company, which prepara...
- Three effects determining the effect of dr...
- What are the characteristics of a powerful...
- What Skills Do Fountain Planning Have
- What are the types of fountain nozzles?
- Which fountain company is better?
- Which fountain company is better?
- Fountain design is the crowning touch in g...